The Agreed Party Wall Surveyor Procedure is a crucial aspect of property ownership, particularly in situations where construction or renovation activities may impact shared walls or structures. This comprehensive guide aims to unravel the intricacies of the Agreed Party Wall Surveyor Procedure, providing a step-by-step understanding of the process and its significance in maintaining positive neighborly relations.
A. Definition and Purpose:
The Party Wall etc. Act 1996 is the legislative foundation that governs the Agreed Party Wall Surveyor Procedure in the United Kingdom. Its primary purpose is to provide a framework for preventing and resolving disputes related to party walls, boundary walls, and excavation near neighboring buildings.
B. Applicability:
The Act applies to various construction activities, including building on or near the boundary line, excavating near neighboring structures, and undertaking works on an existing party wall.
A. Triggering Events:
Notice Served by Adjoining Owner:
When an adjoining owner intends to undertake construction or renovation work that falls under the Act, they are required to serve a formal notice on the adjoining owner.
Response from Adjoining Owner:
The adjoining owner can either consent to the proposed works, dissent and negotiate, or dissent and appoint their own surveyor.
B. The Role of Surveyors:
Agreed Surveyor:
In situations where both parties agree on a single surveyor, this individual acts as the Agreed Surveyor, serving the interests of both parties impartially.
Adjoining Owner's Surveyor:
If the adjoining owner dissents and appoints their own surveyor, the two surveyors work collaboratively to reach an agreement or, if necessary, produce an Award.
A. Format and Content:
Detailed Description of Proposed Works:
The notice must provide a clear and detailed description of the proposed construction or renovation works.
Timelines:
The notice should include the intended start date of the works, ensuring that the adjoining owner has sufficient time to respond.
B. Service:
The notice must be served in writing, either personally or by post. Adjoining owners should be given a minimum of two months' notice, providing ample time for consideration and negotiation.
A. Agreed Surveyor:
If both parties agree on a single surveyor, that individual acts as the Agreed Surveyor, streamlining the process and minimizing costs.
B. Adjoining Owner's Surveyor:
If the adjoining owner dissents and appoints their surveyor, the two surveyors collaborate to produce an Award, a legally binding document that outlines the rights and responsibilities of both parties.
A. Inspection and Assessment:
Initial Site Visit:
The surveyor(s) conduct an initial site visit to assess the impact of the proposed works on the party wall and neighboring structures.
Detailed Report:
A comprehensive report is produced, outlining the current condition of the party wall and providing recommendations for any necessary protective measures.
B. Negotiation and Agreement:
The surveyor(s) facilitate negotiations between the parties, aiming to reach an agreement that protects the interests of both the building owner and the adjoining owner.
C. The Award:
Legal Document:
If an agreement cannot be reached through negotiation, the surveyor(s) produce an Award, a legally binding document that stipulates the rights and responsibilities of both parties concerning the proposed works.
Appeal Process:
Parties have the right to appeal the Award within 14 days of receiving it if they believe there are errors or omissions.
A. Conflict Prevention:
The procedure serves as a proactive measure to prevent disputes and conflicts between neighbors by establishing clear guidelines and responsibilities.
B. Legal Compliance:
Complying with the Party Wall Act and following the Agreed Party Wall Surveyor Procedure ensures that all parties adhere to legal requirements, avoiding potential legal complications.
C. Protecting Interests:
The procedure safeguards the interests of both the building owner and the adjoining owner, ensuring that neither party faces undue inconvenience or damage during the construction process.
In conclusion, the Agreed Party Wall Surveyor Procedure is a critical component of responsible property development and construction. By following the outlined steps and engaging in a transparent and collaborative process, property owners can navigate the complexities of shared walls and structures while fostering positive neighborly relations. The procedure is not merely a legal requirement; it is a tool for effective communication, conflict prevention, and ensuring that construction activities proceed smoothly, respecting the rights and concerns of all parties involved.
For friendly professional advice, contact us or call now and speak with a specialist Party Wall Surveyor.
Adam Joseph Chartered Surveyors is a trading name of Sherling & Partners Limited
Website: https://www.sherlingandpartners.co.uk
Registered Address: Balfour House, Suite 206, 741 High Road, North Finchley N12 0BP
Company Number: 10621087
VAT Number: 265816036
We serve clients in East Ham, Putney, North London, Essex, Finchley,
Birmingham, Richmond and Cambridge.
Our services includes Party Wall Surveyor & Level 3 Building Survey